Bressay field development project

Navigation menu

In addition, Kraken produces a heavy The project's economics have been helped by tax incentives introduced last year by the British government aimed at boosting production from smaller North Sea fields. EnQuest plans to develop the Kraken field using four drilling centres tied back to a floating production storage and offloading FPSO facility.

Cygnus field development project

This will process and store the produced oil and export it using shuttle tankers. The use of such a floater will make decommissioning costs relatively low once the field is depleted.

Equinor looks to Rosebank and Bressay projects after Mariner

The British government has also provided further tax incentives to operators to help with decommissioning and dismantling expenses. The project involves the drilling of 25 wells, 14 of which will be horizontal subsea wells and 11 will be horizontal water injection wells.


  • gun control research paper essay.
  • 5 paragraph essay on anthem!
  • discipline in the classroom essay?
  • negative aspects of online dating essay.
  • hamlet published essays.
  • write self reflection essay!

These will be drilled from two semi-submersible mobile drilling units. Because Kraken's oil is so heavy, its production will require an artificial lift using hydraulic submersible pumps, which will be powered from the FPSO. At peak production, field is expected to produce around 30, barrels per day over a production lifetime of 25 years.

- Statoil: DECC approves Mariner field - Europ├ętrole

Kraken's heavy oil has a low gas-to-oil-ratio GOR so any produced gas will be insufficient to provide the project's heat and power needs over its lifetime. Initially, associated gas and crude oil produced will provide the power needs. Eventually, the project will have to import additional gas via a pipeline from Norway. This will be supplied from the Statoil-operated Bressay field in Norwegian waters, assuming that the Norwegian government approves that field's development.

EnQuest plans to develop the Kraken field using four drilling centres tied back to a floating production storage and offloading FPSO facility. This will process and store the produced oil and export it using shuttle tankers.

Mariner Area Development project status

The use of such a floater will make decommissioning costs relatively low once the field is depleted. The British government has also provided further tax incentives to operators to help with decommissioning and dismantling expenses. The project involves the drilling of 25 wells, 14 of which will be horizontal subsea wells and 11 will be horizontal water injection wells.

These will be drilled from two semi-submersible mobile drilling units. Because Kraken's oil is so heavy, its production will require an artificial lift using hydraulic submersible pumps, which will be powered from the FPSO. At peak production, field is expected to produce around 30, barrels per day over a production lifetime of 25 years. Kraken's heavy oil has a low gas-to-oil-ratio GOR so any produced gas will be insufficient to provide the project's heat and power needs over its lifetime.

Bentley Oil Field

Initially, associated gas and crude oil produced will provide the power needs. Eventually, the project will have to import additional gas via a pipeline from Norway.


  • Mariner Oil Field, North Sea.
  • Access our research platforms.
  • Oil & Gas Vietnam 12222?
  • what is david blankenhorn fatherless america thesis.

This will be supplied from the Statoil-operated Bressay field in Norwegian waters, assuming that the Norwegian government approves that field's development. For most of Kraken's lifetime, the FPSO will require an estimated 1, barrels per day of oil and million cubic feet of gas per day for its operational power needs.


  1. Mariner Area Development, North Sea, UK.
  2. write outline essay mla format.
  3. essay on divorce and the effects on child?
  4. how do you start off a comparison essay.
  5. persuasive essay order.
  6. economic essay competition 2011.
  7. introduction paragraph of compare and contrast essay.
  8. Despite its modest size, Kraken is the largest North Sea development project announced in